# FY26 Willapa Bay Maintenance Dredging Bid Opening Details

Notice 0ac035410aa94fe1af7d9ca01ee4533d (solicitation W912DW26BA001) from DEPT OF DEFENSE, W071 ENDIST SEATTLE, posted 2025-12-15, responses due 2026-01-13T20:30:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | 0ac035410aa94fe1af7d9ca01ee4533d |
| Solicitation number | W912DW26BA001 |
| Type | Solicitation |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE ARMY |
| Office | W071 ENDIST SEATTLE |
| Posted | 2025-12-15T19:40:02.000Z |
| Response deadline (UTC) | 2026-01-13T20:30:00.000Z |
| Set-aside | - |
| NAICS | 237990 |
| PSC | Y1KF |
| Place of performance | - |
| Award | - |

## Description

Please see attached Amendment 0003 for complete details. Willapa Harbor Maintenance Dredging project in Willapa Harbor, Washington. USACE, Seattle District has been tasked to solicit for and award a construction contract to maintenance dredge the Bay Center, Nahcotta, and Tokeland Federal Navigation Channels to their authorized depths. Up to 180,000 CY is expected to be dredged across the three features via mechanical clamshell dredging. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft (Tokeland), MLLW, +2 ft overdepth at each location. In addition, dredging approximately 10,000 CY to a minimum depth of -9 ft MLLW (+1 ft overdepth) may be required in the Bay Center/Palix River Access Lane to ensure sufficient water depths for the dredge, scow, and tugboats to transit between Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay. Dredged material will be disposed via bottom dump scow at the Cape Shoalwater open-water dispersive disposal site or the South Channel open-water dispersive disposal site. Work is anticipated to begin in summer 2026. The work window varies by project features. For any given calendar year, the in-water work windows are as follows:? Bay Center/Palix River: 16 Jul through 30 Sep? Nahcotta: 16 Jul through 01 Feb? Tokeland: 16 Jul through 15 FebWillapa Bay presents significant navigational hazards due to its exposed Pacific Ocean entrance, unmaintained channels, shifting shoals, and unpredictable weather. This performance window includes the worst season for storm and marine conditions. The U.S. Coast Guard has removed aids-to-navigation at Willapa Bar because of unreliable conditions, and their Waterways Analysis notes over 50 unreported groundings annually. These hazards present serious safety concerns for contractors and local users, complicating mobilization and dredging operations throughout the project area.In accordance with Federal Acquisition Regulation (FAR) Part 36 , the estimated construction price range for this project is: Between $5,000,000 and $10,000,000. Estimated duration of the dredging activities is 3-7 months. PLEASE SEE THE ATTACHED SOLICITATION, SPECIFICATIONS AND DRAWINGS FOR INSTRUCTIONS ON SUBMITTING A BID IN RESPONSE TO THE SOLICITATION.

## Sources

- View on SAM.gov: https://sam.gov/opp/0ac035410aa94fe1af7d9ca01ee4533d/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"FY26 Willapa Bay Maintenance Dredging Bid Opening Details, SAM.gov contract opportunity 0ac035410aa94fe1af7d9ca01ee4533d." samgovapi.io, https://samgovapi.io/opportunity/0ac035410aa94fe1af7d9ca01ee4533d, data as of 2026-11-14. Primary record: https://sam.gov/opp/0ac035410aa94fe1af7d9ca01ee4533d/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/0ac035410aa94fe1af7d9ca01ee4533d
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot