# P596 POWERTRAIN (ENGINES ASSEMBLY) FACILITY PROJECT AT CORPUS CHRISTI ARMY DEPOT (CCAD) NAVAL AIR STATION CORPUS CHRISTI, TEXAS.

Notice 422d42dc83b14828be97ba14bd3657d9 (solicitation N6945023R0022) from DEPT OF DEFENSE, NAVFACSYSCOM SOUTHEAST, posted 2023-06-30, responses due 2023-07-14T22:30:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | 422d42dc83b14828be97ba14bd3657d9 |
| Solicitation number | N6945023R0022 |
| Type | Solicitation |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE NAVY |
| Office | NAVFACSYSCOM SOUTHEAST |
| Posted | 2023-06-30T12:01:04.000Z |
| Response deadline (UTC) | 2023-07-14T22:30:00.000Z |
| Set-aside | - |
| NAICS | 236210 |
| PSC | Y1EB |
| Place of performance | Corpus Christi, TX, USA |
| Award | - |

## Description

DESCRIPTION OF ACQUISITION1. This acquisition will result in the award of a Firm-Fixed Price (FFP) contract for Design-Bid-Build (DBB) construction.2. The intent of the project is to construct a new Powertrain Facility (Engines Assembly) CorpusChristi Army Depot at NAS Corpus Christi, Texas to house rotary wing component rebuild activities. Primaryfacilities include an Aircraft Component Repair Shop (ACRS) (140,083 SF building) with open Flex Spaceto house rotary wing component rebuild and maintenance processes and space to house supervision, latrine,and miscellaneous support space; an Administrative Support Facility (65,840 SF building) to includeadministrative space and depot command headquarters; Central Energy Plant (10,260 SF building), specialfoundations, mass notification systems, fire protection, and alarm systems, Energy Monitoring and ControlSystem connection, Antiterrorism Measures, Post Construction Contract Award Services (PCAS), andBuilding Information Systems.Supporting facilities include utilities (electrical service, water, sewer, and natural gas), paving,walks, curbs and gutters, storm drainage, site improvements (to include relocation of playing fields andjogging track), landscaping, low impact development measures, and information systems.3. The contract completion schedule for the entire project is a total of 900 calendar days from dateof contract award. The total project magnitude is between $25,000,000 and $100,000,000.4. The Government intends to award a contract resulting from this solicitation to the responsibleOfferor whose proposal represents the best value after evaluation in accordance with the factors and theirrelative importance in the solicitation.5. This acquisition will be solicited on an unrestricted basis with full and open competition.

## Sources

- View on SAM.gov: https://sam.gov/opp/422d42dc83b14828be97ba14bd3657d9/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"P596 POWERTRAIN (ENGINES ASSEMBLY) FACILITY PROJECT AT CORPUS CHRISTI ARMY DEPOT (CCAD) NAVAL AIR STATION CORPUS CHRISTI, TEXAS., SAM.gov contract opportunity 422d42dc83b14828be97ba14bd3657d9." samgovapi.io, https://samgovapi.io/opportunity/422d42dc83b14828be97ba14bd3657d9, data as of 2026-11-14. Primary record: https://sam.gov/opp/422d42dc83b14828be97ba14bd3657d9/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/422d42dc83b14828be97ba14bd3657d9
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
