# Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support

Notice 63357f528c8a4e3694983fe65ea407e0 (solicitation HARBSS-2027-01) from DEPT OF DEFENSE, FA6648  482 LSS LGC, posted 2026-11-12, responses due 2026-11-26T22:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | 63357f528c8a4e3694983fe65ea407e0 |
| Solicitation number | HARBSS-2027-01 |
| Type | Sources Sought |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE AIR FORCE |
| Office | FA6648  482 LSS LGC |
| Posted | 2026-11-12T14:45:16.000Z |
| Response deadline (UTC) | 2026-11-26T22:00:00.000Z |
| Set-aside | - |
| NAICS | 236220 |
| PSC | 5670 |
| Place of performance | Homestead, FL, USA |
| Award | - |

## Description

Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support Notice Type: Sources Sought / Market Research Notice Number: HARBSS-2027-01 Contracting Office: 482d CONF/PK Location of Performance: Homestead Air Reserve Base, Florida Response Due Date/Time: November 26, 2026, 5:00 PM EST Response Submission: Nika Salemi, nika.salemi.2@us.af.mil Proposed NAICS Code: 236220, Commercial and Institutional Building Construction Proposed Product Service Code (PSC): 5670 Building Components, Prefabricated 1. Notice Purpose THIS IS A SOURCES SOUGHT NOTICE ISSUED FOR MARKET-RESEARCH AND PLANNING PURPOSES ONLY. THIS NOTICE IS NOT A SOLICITATION, REQUEST FOR PROPOSAL, REQUEST FOR QUOTATION, INVITATION FOR BID, OR COMMITMENT BY THE GOVERNMENT TO AWARD A CONTRACT. The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL, seeks information from capable commercial sources, including all small-business socioeconomic categories, to determine the availability and capability of firms that can perform the requirement described in Attachment 1 KYJM19-9003 Outdoor Fitness SOW, Red Horse Project, 12 Nov 2026. Responses will be used to support acquisition planning, including consideration of the appropriate contract type, acquisition approach, and potential small-business set-aside strategy. The Government will not reimburse respondents for any costs associated with preparation or submission of information in response to this notice. A response to this notice is not required to respond to a future solicitation, if issued. Any future solicitation will be announced separately. 2. Requirement Overview The 482d Contracting Flight, Homestead Air Reserve Base (HARB), FL is conducting market research for the Outdoor Fitness Facility, Building 389 project at Homestead Air Reserve Base (HARB), Florida. The anticipated requirement is primarily for the procurement, delivery, and associated submittals for construction materials and equipment required to support construction of an outdoor fitness facility. Air Force RED HORSE personnel will perform the majority of construction and installation activities. Contractor installation responsibilities are limited principally to the steel picket fence and, if applicable, a separate lightning-protection system. The contractor would be expected to: Procure and deliver all materials identified in the Government-furnished bill of materials (BOM), Attachment 2 Outdoor Fitness Facility, BOM Template. Furnish the Pre-Engineered Building (PEB) package, including engineered shop drawings and all associated structure materials. Coordinate concrete-truck deliveries to support Government construction execution. Furnish the specified construction equipment for the required durations, fueled and ready for operation at the work site. Install a new steel picket fence, including site restoration for areas disturbed by fence installation. Install a lightning-protection system if the proposed PEB cannot include a compliant built-in lightning-protection system. The provided BOM identifies, among other materials and equipment, rubber fitness flooring, concrete masonry materials, electrical distribution materials, outdoor fans, motion-activated lighting, concrete, base course, PEB-related items, and construction-equipment rentals. 3. Anticipated Scope 3.1 Material Procurement and Delivery The contractor shall be capable of procuring, delivering, and warranting the materials and equipment identified in the Government-furnished BOM. The contractor shall provide required material and equipment submittals before ordering materials, and the Government will approve final submittals in writing before purchase. Anticipated submittals include: Steel picket fence; PEB signed and sealed shop drawings; Outdoor ceiling fans; Lighting; Smart meter; Electrical panel; Fitness flooring; Bird netting; Material warranty plan, including roof, flooring, and other applicable equipment warranties; and Fence material and labor warranty. 3.2 Pre-Engineered Building Package The contractor shall be capable of providing a complete PEB material package based on Government design drawings, including digitally signed and sealed shop drawings prepared by a Professional Engineer. The PEB package is expected to include, at a minimum: Lifting-rack/support beams; A fixed steel beam with predrilled holes for 25-foot ropes; Toe-hold bars located three inches above the finished floor; Factory coating and painting, with Government-selected colors; Medium-bronze exterior roof panels and manufacturer-standard light interior roof panels; Standing seam metal roofing; Gutters and downspouts; Built-in copper lightning protection, where available; and Black, heavy-duty polyethylene bird netting with ¾-inch mesh meeting or exceeding the specified mesh-quality and break-strength requirements. The PEB shall be designed in accordance with the SOW’s specified structural and high-velocity-wind requirements. The SOW requires a minimum 20-year material warranty, a current Miami-Dade Notice of Acceptance for the PEB and insulation, and a roof assembly capable of the stated uplift and wind criteria. Zinc-plated metal is prohibited. 3.3 Lightning Protection System — Conditional Installation If a compliant PEB with built-in lightning protection is unavailable, the contractor shall be capable of furnishing and installing a conventional lightning-protection and grounding system following completion of RED HORSE construction activities. The contractor’s capability should include: Copper lightning-protection materials; Installation shop drawings; UL-listed and labeled components; Fence-bonding connections; Grounding-system testing and test-point documentation; Third-party inspection and written certification by an entity independent of the system designer and installer; and Compliance with the project’s cited lightning-protection requirements. 3.4 Steel Picket Fence Installation and Site Restoration The contractor shall be capa

## Sources

- View on SAM.gov: https://sam.gov/opp/63357f528c8a4e3694983fe65ea407e0/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support, SAM.gov contract opportunity 63357f528c8a4e3694983fe65ea407e0." samgovapi.io, https://samgovapi.io/opportunity/63357f528c8a4e3694983fe65ea407e0, data as of 2026-11-14. Primary record: https://sam.gov/opp/63357f528c8a4e3694983fe65ea407e0/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/63357f528c8a4e3694983fe65ea407e0
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
