# Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Notice 649dc0a978a341069f1a42f2fbd0a736 (solicitation W9127N26BA024) from DEPT OF DEFENSE, W071 ENDIST PORTLAND, posted 2026-08-19, responses due 2026-09-18T22:00:00.000Z. Status: closed.

| Field | Value |
| --- | --- |
| Notice ID | 649dc0a978a341069f1a42f2fbd0a736 |
| Solicitation number | W9127N26BA024 |
| Type | Solicitation |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE ARMY |
| Office | W071 ENDIST PORTLAND |
| Posted | 2026-08-19T22:30:48.000Z |
| Response deadline (UTC) | 2026-09-18T22:00:00.000Z |
| Set-aside | Small Business Set Aside - Total |
| NAICS | 237310 |
| PSC | Y1LB |
| Place of performance | Cascade Locks, OR, USA |
| Award | - |

## Description

The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.

## Sources

- View on SAM.gov: https://sam.gov/opp/649dc0a978a341069f1a42f2fbd0a736/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement, SAM.gov contract opportunity 649dc0a978a341069f1a42f2fbd0a736." samgovapi.io, https://samgovapi.io/opportunity/649dc0a978a341069f1a42f2fbd0a736, data as of 2026-11-14. Primary record: https://sam.gov/opp/649dc0a978a341069f1a42f2fbd0a736/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/649dc0a978a341069f1a42f2fbd0a736
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot