# 66--INERTIAL MEASURING

Notice 8ff6e9e4670c42db98169fbf320192d2 (solicitation N0010425RXB57) from DEPT OF DEFENSE, NAVSUP WEAPON SYSTEMS SUPPORT MECH, posted 2026-11-04, responses due 2026-12-03T16:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | 8ff6e9e4670c42db98169fbf320192d2 |
| Solicitation number | N0010425RXB57 |
| Type | Solicitation |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE NAVY |
| Office | NAVSUP WEAPON SYSTEMS SUPPORT MECH |
| Posted | 2026-11-04T09:29:46.000Z |
| Response deadline (UTC) | 2026-12-03T16:00:00.000Z |
| Set-aside | - |
| NAICS | 334511 |
| PSC | 6605 |
| Place of performance | - |
| Award | - |

## Description

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| VALUE ENGINEERING (JUN 2020)|3|||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2025)|4||X||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS ($100K)(FEB 1997)|1|| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|334511|1350|X|X|||||||||| TYPE OF CONTRACT (APR 1984)|1|FIRM FIXED PRICE| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| THE OFFER DUE DATE HAS BEEN EXTENDED TO 31 JULY 2O26 OFFER DUE DATE HAS BEEN EXTENDED TO 01 JULY 2026. OFFER DUE DATE HAS BEEN EXTENDED TO 10/23/2025. OFFER DUE DATE HAS BEEN EXTENDED TO 26 SEPTEMBER 2025 OFFER DUE DATE HAS BEEN EXTENDED. 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the INERTIAL MEASURING . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The INERTIAL MEASURING furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;03956 4300859; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Electrostatic Discharge Control - The Contractor shall comply with the electrostatic discharge control requirements established in ANSI/ESD S20.20, "ESD Association Standard for the Development of an Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)", which superseded MIL-STD-1686C. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2

## Sources

- View on SAM.gov: https://sam.gov/opp/8ff6e9e4670c42db98169fbf320192d2/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"66--INERTIAL MEASURING, SAM.gov contract opportunity 8ff6e9e4670c42db98169fbf320192d2." samgovapi.io, https://samgovapi.io/opportunity/8ff6e9e4670c42db98169fbf320192d2, data as of 2026-11-14. Primary record: https://sam.gov/opp/8ff6e9e4670c42db98169fbf320192d2/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/8ff6e9e4670c42db98169fbf320192d2
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
