# 437-22-108 Place Chilled Water Pumps on Epower

Notice 9c456b31d0a04a9ba952189a322c5d0a (solicitation 36C26326B0013) from VETERANS AFFAIRS, DEPARTMENT OF, NETWORK CONTRACT OFFICE 23 (36C263), posted 2026-01-20, responses due 2026-02-06T20:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | 9c456b31d0a04a9ba952189a322c5d0a |
| Solicitation number | 36C26326B0013 |
| Type | Presolicitation |
| Agency | VETERANS AFFAIRS, DEPARTMENT OF |
| Sub-tier | VETERANS AFFAIRS, DEPARTMENT OF |
| Office | NETWORK CONTRACT OFFICE 23 (36C263) |
| Posted | 2026-01-20T19:03:42.000Z |
| Response deadline (UTC) | 2026-02-06T20:00:00.000Z |
| Set-aside | Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source (FAR 19.14) |
| NAICS | 236220 |
| PSC | Y1DA |
| Place of performance | Fargo, ND, USA |
| Award | - |

## Description

Work shall include, but shall not be limited to providing all abor, materials, equipment, etc necessary to complete Fargo VA Health Care System project 437- 22-108, Place Chilled Water Pumps on Emergency Power, in accordance with this Scope of Work, NEC, VHA Directive 1028 (Electrical Power Distribution Systems), the contract documents, all applicable federal, state and local codes as well as all NFPA requirements. Work shall include, but shall not be limited to, installation and commissioning of anew automatic transfer switch for the five (5) 40 hp chilled water pumps (CHWP#1-5) in BE-27 mechanical room to maintain an emergency equipment branchpower path (from panel in ) and a normal branch power path (from panel in), aswell as breaker location switching and replacement for pumps 8, 9, 12, 13, 14,15, 16, 17, 18, and 19, with Motor Control Center (MCC) bucket swapping and relocation for pumps 8 and 9, with all necessary conduit and wire demolition, intercepting, rerouting, and installation to bring them onto emergency equipment branch power. Some pieces of electrical distribution equipment will require commissioning services to be obtained by the Contractor and include at a minimum, the automatic transfer switch. The Contractor shall account for and be prepared to replace all necessary devices, cabling, and conduit as needed and per specifications. As part of commissioning, the Contractor shall be responsible for testing all equipment installed per NEC, and the best practices and standards issued by the National Electrical Testing Association (NETA), and the Institute of Electrical and Electronics Engineers (IEEE). Period of Performance =270 calendar Days

## Sources

- View on SAM.gov: https://sam.gov/opp/9c456b31d0a04a9ba952189a322c5d0a/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"437-22-108 Place Chilled Water Pumps on Epower, SAM.gov contract opportunity 9c456b31d0a04a9ba952189a322c5d0a." samgovapi.io, https://samgovapi.io/opportunity/9c456b31d0a04a9ba952189a322c5d0a, data as of 2026-11-14. Primary record: https://sam.gov/opp/9c456b31d0a04a9ba952189a322c5d0a/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/9c456b31d0a04a9ba952189a322c5d0a
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot