# Heise Roberts Levee Rehab

Notice a47e3d0bcd064fdb8b1d7096abef29ec (solicitation W912EF26RSS029) from DEPT OF DEFENSE, US ARMY ENGINEER DISTRICT WALLA WAL, posted 2026-05-28, responses due 2026-06-04T23:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | a47e3d0bcd064fdb8b1d7096abef29ec |
| Solicitation number | W912EF26RSS029 |
| Type | Sources Sought |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE ARMY |
| Office | US ARMY ENGINEER DISTRICT WALLA WAL |
| Posted | 2026-05-28T12:52:47.000Z |
| Response deadline (UTC) | 2026-06-04T23:00:00.000Z |
| Set-aside | - |
| NAICS | 237990 |
| PSC | - |
| Place of performance | - |
| Award | - |

## Description

Heise-Roberts Right Bank Upper System Damage Site # 1 ? This site is located on the right bank levee system approximately 1 mile upstream of Lorenzo Bridge. At this levee segment, the river is eroding the streambank to the point of encroaching on the toe of the levee. This levee segment is not armored with riprap. The levee needs riprap revetment to protect the toe and slope of the levee prior to the next flood event. Excavating down approximately 8? to the toe of the levee and armoring the levee with riprap on the riverside side of the levee is necessary to protect the levee from eroding. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Upper System Damage Site # 2 ? This site is located on the right bank levee near Lorenzo Bridge. At this levee segment the large, dumped stone upstream of the railroad bridge abutment has been undercut and washed downstream. Additional riprap is needed to key in the remaining riprap and protect the toe of the levee and areas of erosion on the slope of the levee. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Lower System Damage Site # 3 ? This site is located on the right bank levee system near Roberts Bridge. This site has experienced erosion at the toe of slope, and the riprap has slid down the slope of the levee, leaving the upper levee exposed to erosion. Riprap revetment would need to be keyed in with existing riprap to protect the upper part of the levee and existing riprap needs to be keyed in to create a stable toe. This site is approximately 300 linear feet in length.Heise-Roberts Left Bank Levee System Damage Site # 4 - This site is located on the left bank levee system, approximately 1.5 miles downstream of Lorenzo Bridge. This site is at an impingement point that eroded a large amount of riverbank that was repaired during a flood fight. A Riprap toe bench needs to be placed and keyed in with the existing slope riprap revetment placed during previous flood fight conditions. This site is approximately 600 linear feet in length.

## Sources

- View on SAM.gov: https://sam.gov/opp/a47e3d0bcd064fdb8b1d7096abef29ec/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"Heise Roberts Levee Rehab, SAM.gov contract opportunity a47e3d0bcd064fdb8b1d7096abef29ec." samgovapi.io, https://samgovapi.io/opportunity/a47e3d0bcd064fdb8b1d7096abef29ec, data as of 2026-11-14. Primary record: https://sam.gov/opp/a47e3d0bcd064fdb8b1d7096abef29ec/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/a47e3d0bcd064fdb8b1d7096abef29ec
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
