# New Meadows Range Barn

Notice b08fa8ab3a6d41a3b8a58fc869b015d8 (solicitation 1240LT27Q0027) from AGRICULTURE, DEPARTMENT OF, PAYETTE NATIONAL FOREST, posted 2026-10-29, responses due 2026-11-29T00:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | b08fa8ab3a6d41a3b8a58fc869b015d8 |
| Solicitation number | 1240LT27Q0027 |
| Type | Combined Synopsis/Solicitation |
| Agency | AGRICULTURE, DEPARTMENT OF |
| Sub-tier | FOREST SERVICE |
| Office | PAYETTE NATIONAL FOREST |
| Posted | 2026-10-29T13:05:11.000Z |
| Response deadline (UTC) | 2026-11-29T00:00:00.000Z |
| Set-aside | Small Business Set Aside - Total |
| NAICS | 237110 |
| PSC | Z2JZ |
| Place of performance | ID, USA |
| Award | - |

## Description

A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654. B. Base work includes the following described below: 1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing. 2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces. 3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces. 4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required. C. Optional work includes the following described below: 1. Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers. D. Quantities associated with these options are identified in the Schedule of Items

## Sources

- View on SAM.gov: https://sam.gov/opp/b08fa8ab3a6d41a3b8a58fc869b015d8/view
- Data as of 2026-11-13. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"New Meadows Range Barn, SAM.gov contract opportunity b08fa8ab3a6d41a3b8a58fc869b015d8." samgovapi.io, https://samgovapi.io/opportunity/b08fa8ab3a6d41a3b8a58fc869b015d8, data as of 2026-11-13. Primary record: https://sam.gov/opp/b08fa8ab3a6d41a3b8a58fc869b015d8/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/b08fa8ab3a6d41a3b8a58fc869b015d8
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
