# 16--HOUSING,LIQUID PUMP - AND OTHER REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Notice bcdeaed8c2d74b71930d6053ca6e4fa8 (solicitation N0038327RNA23) from DEPT OF DEFENSE, NAVSUP WEAPON SYSTEMS SUPPORT, posted 2026-11-09, responses due 2026-11-12T18:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | bcdeaed8c2d74b71930d6053ca6e4fa8 |
| Solicitation number | N0038327RNA23 |
| Type | Solicitation |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE NAVY |
| Office | NAVSUP WEAPON SYSTEMS SUPPORT |
| Posted | 2026-11-09T12:11:42.000Z |
| Response deadline (UTC) | 2026-11-12T18:00:00.000Z |
| Set-aside | - |
| NAICS | 336413 |
| PSC | 1610 |
| Place of performance | - |
| Award | - |

## Description

CONTACT INFORMATION|4|N731.47|N00383|771-229-0615|ARIANNA.G.PILLA.CIV@US.NAVY.MIL| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Reports (combo)|Inspection Site source final acceptance site source|TBD|N00383|TBD|TBD|See schedule|n/a||||||||| Terms & Conditions of BOA N0038322GZ901 apply. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 1.5 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows: 3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use: 1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations. 2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L). 3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to. The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregat

## Sources

- View on SAM.gov: https://sam.gov/opp/bcdeaed8c2d74b71930d6053ca6e4fa8/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"16--HOUSING,LIQUID PUMP - AND OTHER REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF, SAM.gov contract opportunity bcdeaed8c2d74b71930d6053ca6e4fa8." samgovapi.io, https://samgovapi.io/opportunity/bcdeaed8c2d74b71930d6053ca6e4fa8, data as of 2026-11-14. Primary record: https://sam.gov/opp/bcdeaed8c2d74b71930d6053ca6e4fa8/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/bcdeaed8c2d74b71930d6053ca6e4fa8
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
