# STA Sand Key Repair Fuel Lines and Tank

Notice bf611ac4df784eab97a3e386eb2e8618 (solicitation 30321PR270000001) from HOMELAND SECURITY, DEPARTMENT OF, BASE MIAMI BEACH, posted 2026-10-29, responses due 2026-11-13T20:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | bf611ac4df784eab97a3e386eb2e8618 |
| Solicitation number | 30321PR270000001 |
| Type | Combined Synopsis/Solicitation |
| Agency | HOMELAND SECURITY, DEPARTMENT OF |
| Sub-tier | US COAST GUARD |
| Office | BASE MIAMI BEACH |
| Posted | 2026-10-29T11:40:24.000Z |
| Response deadline (UTC) | 2026-11-13T20:00:00.000Z |
| Set-aside | Small Business Set Aside - Total |
| NAICS | 237120 |
| PSC | Z2PZ |
| Place of performance | Clearwater Beach, FL, USA |
| Award | - |

## Description

COMBINED SYNOPSIS / SOLICITATION NOTICE Commercial Products and Commercial Services / Simplified Acquisition Procedures (In accordance with FAR Subpart 12.6 and FAR Part 13 / FAR Subpart 36.2 as applicable) GENERAL INFORMATION • Action Code: Combined Synopsis/Solicitation • Document Type: Combined Synopsis/Solicitation Notice • Solicitation Number: 30321PR270000001 • Notice Date: 10/29/2026 • Set-Aside Status: Total Small Business Set-Aside • Primary NAICS Code: 237120 – Oil and Gas Pipeline and Related Structures Construction • Small Business Size Standard: $45.0 Million (for NAICS 237120) • Product Service Code (PSC): Z2PZ – Repair or Alteration of Other Utilities POINTS OF CONTACT Contracting Officer’s Representative: MKC Zachery Little Email: Zachery.T.Little@uscg.mil Phone: (417) 612-3258 SECTION 1: SYNOPSIS & DESCRIPTION This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued separately. The Department of Homeland Security, United States Coast Guard (USCG), has a requirement for repair, remediation, testing, and coating of fuel lines, storage tanks, and associated fuel system infrastructure located at USCG Station Sand Key, Clearwater, Florida. The Government intends to award a single, Firm-Fixed-Price (FFP) contract resulting from this request for quotation (RFQ). SECTION 2: PLACE OF PERFORMANCE & OPERATIONAL HOURS • Location: United States Coast Guard Station Sand Key 1375 Gulf Boulevard Clearwater, FL 33767 • Operating Hours: Normal base operating hours are 0700 to 1700 (7:00 AM – 5:00 PM), Monday through Friday, excluding federal holidays. Any work required outside these hours must receive prior written coordination and approval from the Contracting Officer’s Representative (COR). • Continuity of Operations: Station Sand Key is an active, operational military facility. The contractor shall coordinate all operations with the unit to ensure the station does not lose the capability to fuel operational vessels during the execution of repairs. SECTION 3: SUMMARY SCOPE OF WORK (SOW) DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD STATION SAND KEY SPECIFICATIONS FOR Repair Fuel Lines & Tank General: United States Coast Guard Station Sand Key requesting repair work to be completed on various fuel lines and fuel related systems. Location: United States Coast Guard Station Sand Key. 1375 Gulf Boulevard Clearwater, FL 33767 I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 0700 to 1700 Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative. II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work. III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities. MKC Zachery Little Zachery.T.Little@uscg.mil 417-612-3258 IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in Station dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations. VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor. VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense. VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification. IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government. X: Regulations while onboard Coast Guard Station Sand Key: 1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flag pole & maintain silence and all vehicles & equipment will halt during these brief events. 2. The constructi

## Sources

- View on SAM.gov: https://sam.gov/opp/bf611ac4df784eab97a3e386eb2e8618/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"STA Sand Key Repair Fuel Lines and Tank, SAM.gov contract opportunity bf611ac4df784eab97a3e386eb2e8618." samgovapi.io, https://samgovapi.io/opportunity/bf611ac4df784eab97a3e386eb2e8618, data as of 2026-11-14. Primary record: https://sam.gov/opp/bf611ac4df784eab97a3e386eb2e8618/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/bf611ac4df784eab97a3e386eb2e8618
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
