# Callao, Peru Infrastructure Modernization - U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA)

Notice c6850cd644084320a33d7cd7be68d8b3 (solicitation W51DQV27S1CQ0) from DEPT OF DEFENSE, W2SR ENDIST CARIBBEAN(PROVIS), posted 2026-11-10, responses due 2026-12-10T20:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | c6850cd644084320a33d7cd7be68d8b3 |
| Solicitation number | W51DQV27S1CQ0 |
| Type | Sources Sought |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE ARMY |
| Office | W2SR ENDIST CARIBBEAN(PROVIS) |
| Posted | 2026-11-10T16:14:29.000Z |
| Response deadline (UTC) | 2026-12-10T20:00:00.000Z |
| Set-aside | - |
| NAICS | 236220 |
| PSC | - |
| Place of performance | Callao, PER |
| Award | - |

## Description

Amendment to the Sources Sought - November 10, 2026 The following questions have been added: How do our shipping restrictions affect your pricing, schedule, and risk? How does the Jones Act impact your logistics process, if at all? If regulations did not matter, what do you recommend to make the logistics and transportation process easier for US Government requirements? How does the Balance of Payments Program impact your list of suppliers? How frequent does the logistics process directly contribute to delays or cost increases? Have you lost revenue due to logistics delays/issues that could have been addressed earlier in the procurement process? ****SOURCES SOUGHT FOR MARKET RESEARCH PURPOSES ONLY**** This announcement seeks information from industry which will be used for preliminary planning purposes. No proposals are being requested or accepted with this announcement. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. NO SOLICITATION, SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME. 1. AGENCY: United States Army Corps of Engineers (USACE) Latin America and Caribbean District (SAA) 2. NAICS: 236220 - Commercial and Institutional Building Construction 3. PLACE OF PERFORMANCE: Peru 4. ACQUISITION INFORMATION: The U.S. Army Corps of Engineers (USACE), Latin America and Caribbean District (SAA), is issuing this Sources Sought announcement as a means of conducting market research to identify parties having an interest in and the resources to support a potential future design-build construction project at the Callao Naval Base, Lima, Peru. The result of this market research will contribute to determining the method of procurement. Estimated Magnitude of Construction: Between $25,000,000 and $50,000,000. Performance Period: 540 days after Notice to Proceed. Anticipated Award Date: Fiscal Year 2027 Quarter 3 Small Business Programs: In accordance with FAR 19.000(b)(1)(ii), the Procuring Contracting Officer (PCO) has elected not to apply FAR Part 19 (Small Business Programs) to this overseas procurement. Consequently, small business set-asides will not be utilized for this project in Peru. However, all responsible sources—including both U.S. concerns (large and small) and foreign entities—are encouraged to submit responses to this Sources Sought notice. 5. ANTICIPATED ACQUISITION STRATEGY: The acquisition strategy for this requirement will be determined based on the responses to this Sources Sought notice and other market research. The Government is considering several compliant acquisition pathways to ensure the successful delivery of this complex Design-Build project in Peru. All interested firms are strongly encouraged to submit a comprehensive capabilities statement, as the information received will be critical in determining the final method of procurement. The primary anticipated strategy is a Two-Phase Design-Build procurement under the authority of FAR Part 36.3. In this scenario, the Government would issue a public Phase 1 solicitation requesting offeror qualifications. Based on these qualifications, the Government would down-select the most highly qualified firms (typically no more than five) who would then be eligible to compete in Phase 2 and submit detailed technical and price proposals. However, based on the unique challenges of performing complex construction in Peru, the Government is also considering the following alternative strategies: Option 1: Limited Competition under FAR Part 6, Other Than Full and Open Competition. If market research reveals that only a very limited number of sources possess the unique combination of Design-Build expertise, mandatory Peruvian licensing (Registro Nacional de Proveedores - RNP), and demonstrated experience with specialized facilities (e.g., POL, medical, secure warehouses) in the local market, the Government may justify limiting competition. Option 2: Establishment of a Qualified Bidders List (QBL) under FAR Part 9.2. If the operational environment in Peru and the specialized nature of the requirement warrant it, the Government may decide to establish a formal Qualification Requirement. Under this authority, the Government would create a list of pre-qualified firms that demonstrate the essential standards for technical capability, financial stability, and in-country operational capacity. Future solicitations for this requirement would then be limited to firms on this established QBL. The Government’s final decision will be based on which strategy provides the best value and ensures a competitive environment among responsible and qualified contractors capable of meeting the demanding technical and logistical requirements of this project. 6. PROJECT DESCRIPTION: The contemplated scope consists of complete Design-Build services—including geotechnical verification, site preparation, civil works, architectural and engineering design after award, structural construction, mechanical/electrical/plumbing (MEP), specialized HVAC/fire suppression, Defense Base Act (DBA) insurance coverage, and Furniture, Fixtures, & Equipment (FF&E). Facility / Scope Package Primary Function Key Technical Considerations Building 110 Spare Parts Warehouse Heavy-duty slab design, industrial racking integration, material handling flow, automated logistics staging. Building 115 Clothing & Gear Warehouse High-density pallet storage, humidity and climate control, inventory distribution bays. Building 112 Material Warehouse Bulk staging, overhead crane/hoist accommodations, heavy equipment ingress/egress ramps. Building 113 Customs Warehouse Secure bonded holding areas, host-nation customs inspection layout, physical security infrastructure. Building 114 Petroleum, Oil, and Lubricants (POL) Warehouse Secondary containment, explosion-proof electrical systems, specialized foam/water fire suppression, environmental drainage controls. Building 111 Medicine & Medical Supplies Warehouse Temperature/humidity-controlled storage (cold

## Sources

- View on SAM.gov: https://sam.gov/opp/c6850cd644084320a33d7cd7be68d8b3/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"Callao, Peru Infrastructure Modernization - U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA), SAM.gov contract opportunity c6850cd644084320a33d7cd7be68d8b3." samgovapi.io, https://samgovapi.io/opportunity/c6850cd644084320a33d7cd7be68d8b3, data as of 2026-11-14. Primary record: https://sam.gov/opp/c6850cd644084320a33d7cd7be68d8b3/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/c6850cd644084320a33d7cd7be68d8b3
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
