# 16--BLADE ASSEMBLY,MAIN, IN REPAIR/MODIFICATION OF

Notice d69930cdf4e7470982af010070be8475 (solicitation N0038325RN053) from DEPT OF DEFENSE, NAVSUP WEAPON SYSTEMS SUPPORT, posted 2024-11-25, responses due 2024-12-23T18:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | d69930cdf4e7470982af010070be8475 |
| Solicitation number | N0038325RN053 |
| Type | Solicitation |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE NAVY |
| Office | NAVSUP WEAPON SYSTEMS SUPPORT |
| Posted | 2024-11-25T11:41:57.000Z |
| Response deadline (UTC) | 2024-12-23T18:00:00.000Z |
| Set-aside | - |
| NAICS | 333998 |
| PSC | 1615 |
| Place of performance | - |
| Award | - |

## Description

CONTACT INFORMATION|4|N731.37|M3F|215-697-0370|Leah.L.Brown5.civ@us.navy.mil| All terms and conditions of BOA N00383-20-G-X901 apply. This is a repair requirement. Repair Turnaround Time (RTAT): the resultant contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor?s facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must obtain finalinspection and acceptance by the Government for all assets within the RTATsestablished in this contract. Requested RTAT: 0060 Days Proposals shall reference the proposed RTAT and any capacity constraints. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: BLADE ASSEMBLY,MAIN ;0RH 1615 016938205 H5; NSN , ;06150-09000-048; Part Number, Shall be performed IAW: BLADE ASSEMBLY,MAIN ;The latest revision of technical manual/approved repair procedures; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: BLADE ASSEMBLY,MAIN ;06150-09000-048; P/N, ;1615 016938205; NSN, ;The latest technical manual/approved repair procedures.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 

## Sources

- View on SAM.gov: https://sam.gov/opp/d69930cdf4e7470982af010070be8475/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"16--BLADE ASSEMBLY,MAIN, IN REPAIR/MODIFICATION OF, SAM.gov contract opportunity d69930cdf4e7470982af010070be8475." samgovapi.io, https://samgovapi.io/opportunity/d69930cdf4e7470982af010070be8475, data as of 2026-11-14. Primary record: https://sam.gov/opp/d69930cdf4e7470982af010070be8475/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/d69930cdf4e7470982af010070be8475
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
