# Z2NZ--659-24-203: Extend Chilled Water to Hospice and Audiology

Notice dd7b009e8ae84c3fbff15448458150df (solicitation 36C24626B0039) from VETERANS AFFAIRS, DEPARTMENT OF, 246-NETWORK CONTRACTING OFFICE 6 (36C246), posted 2026-07-21, responses due 2026-09-08T14:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | dd7b009e8ae84c3fbff15448458150df |
| Solicitation number | 36C24626B0039 |
| Type | Presolicitation |
| Agency | VETERANS AFFAIRS, DEPARTMENT OF |
| Sub-tier | VETERANS AFFAIRS, DEPARTMENT OF |
| Office | 246-NETWORK CONTRACTING OFFICE 6 (36C246) |
| Posted | 2026-07-21T17:53:02.000Z |
| Response deadline (UTC) | 2026-09-08T14:00:00.000Z |
| Set-aside | Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) |
| NAICS | 238220 |
| PSC | Z2NZ |
| Place of performance | Salisbury, NC, USA |
| Award | - |

## Description

Subject: Statement of Work: Install Chill Water Lines to Hospice and Audiology Location: Campus Project #: 659-24-203 Date: 26 February 2026 STATEMENT OF WORK Mechanical General: The project involves providing chilled Water from Building 31 primary chiller to serve Buildings 42 and 43. This project should be completed in 365 days and include a 1-year warranty on all items. Background Information: Building 42 and Building 43 are on separate systems, the VA wants them on the same system as Building 31. SCOPE OF WORK: Provide chilled water from the building 31 primary chiller to serve Buildings 42 and 43, bypassing the existing chillers in 42 and 43 during normal operation. Normal Operation (Primary from Building 31) Building 42 and Building 43 are served directly from building 31 chilled-water plant. The existing chillers for 42 and 43 are isolated and not in use. Valves and actuators shall be connected to the Building Management System (BMS) and automatically controlled for mode selection. Bypass Mode (Local Chillers in Service) Building 42: The existing chiller serves the 2" chilled-water line supplying Audiology. Glycol shall be replenished through the pot feeder. Building 43: The existing chiller serves the 3" chilled-water line supplying the building. Glycol shall be replenished through the pot feeder. New Work / Modifications Install additional pumps in Building 42 to serve the 2" chilled-water line to Audiology. Run new 4" chilled-water supply and return lines from Building 31 to Building 43. Provide emergency backup chilled-water access: Building 42: Quick-connect ports. Building 43: Bolted flange connection. All new valves and actuators shall be BMS-integrated for automatic operation and remote monitoring. Contractor Trades: Division 01 General Requirements Rig, hoist, and place pumps, long pipe runs, and large valves especially for elevated or exterior segments. Develop and execute functional performance tests for both modes, including BMS sequences, alarms, failover, and remote monitoring. Produce pre-functional checklists, FPT scripts, deficiency logs, and final Cx report. Implement Infection Control Risk Assessment (ICRA) measures near Audiology and any patient-care areas: barriers, negative air, dust control, HEPA, clean paths. Noise/vibration management during coring and pump installation; off-hours work planning if needed. Maintain life safety (egress, fire alarm impairments) and hot work permits. Mechanical/Electrical permits, right-of-way if exterior work crosses public domain, and VA safety protocols. Badging and security clearances for contractors working on campus. Division 2: Existing Conditions Hazardous materials handling for penetrations in older construction (asbestos/lead). Perform pre-work survey and abate if found. Preconstruction survey of pipe routing; locates for existing utilities; as-builts for final turnover. Division 03 -Concrete Install housekeeping pads for pumps or associated equipment in Bldg. 42. Perform core drilling, sleeves, and wall/floor penetrations; patch and restore finishes. Division 23: HVAC Install new 4" chilled-water supply and return from Building 31 to Building 43 (routing, piping, valves, bolted flange connection at Bldg. 43). Add pumps in Building 42 to serve the 2" CHW line to Audiology (set pumps, suction/discharge fittings, check valves, balancing valves). Install quick-connect ports at Building 42 and bolted flange at Building 43 for emergency backup CHW access. Provide/replace valves and actuators; isolate existing chillers in 42 and 43 for normal operation; configure bypass tie-ins. Hot work (welding/brazing), threaded/flanged connections, equipment anchorage, and system rinsing/flush. Integrate valves and actuators into BMS for automatic mode selection (Normal vs. Bypass). Provide points list, sequences of operation, graphics, and alarm/notification setup. Program interlocks between Building 31 plant and local chillers; ensure remote monitoring visibility. Coordinate network connectivity to VA systems (per IT/security requirements). Insulate new and modified CHW piping, valves, and fittings; provide condensation control and energy code compliance. Apply pipe identification (color bands, flow arrows) and valve tags. Hydronic balancing of flows for both Normal Operation (from Bldg. 31) and Bypass Mode (local chillers). Verify T, pump head/curve alignment, and distribution performance to Audiology and Bldg. 43 loads. Provide glycol supply and concentration management (both buildings use pot feeders in Bypass Mode). Test inhibitor levels, pH, and conductivity; provide documentation and labels for glycol concentration. Touch-up coatings on exposed piping and supports; ASME A13.1 compliant pipe marking and valve tags. Division 26: Electrical Provide power to new pumps, actuators, and any control panels (breakers, disconnects, conduit, wiring). Install VFDs (if specified/required for pump control), control power transformers as needed. Bond/ground all new mechanical equipment and supports; label circuits. Division 27: Communications Run and terminate BMS cabling (twisted pair, network, I/O), install field panels, power supplies for actuators. Support the controls contractor with panel mounting, device terminations, and point-to-point checkout. Division 31 - Earthwork Trenching or directional boring, routing, backfill, and site restoration (hardscape/landscape). Coordinate utility locating (public + private locates) and storm/sanitary separation clearances. Division 32 Exterior Improvements Coordinate erosion & sediment control, site concrete/flatwork restoration: asphalt cut & patch; pavement markings. List of Deliverables: 1. Project Administration Deliverables Project Schedule (Preliminary + Baseline CPM) Phasing Plan (if applicable) Site Logistics / Staging Plan Contractor s Quality Control (CQC) Plan Accident Prevention Plan (APP) Activity Hazard Analyses (AHAs) Infection Control Risk Assessment (ICRA)/PCRA coordination document

## Sources

- View on SAM.gov: https://sam.gov/opp/dd7b009e8ae84c3fbff15448458150df/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"Z2NZ--659-24-203: Extend Chilled Water to Hospice and Audiology, SAM.gov contract opportunity dd7b009e8ae84c3fbff15448458150df." samgovapi.io, https://samgovapi.io/opportunity/dd7b009e8ae84c3fbff15448458150df, data as of 2026-11-14. Primary record: https://sam.gov/opp/dd7b009e8ae84c3fbff15448458150df/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/dd7b009e8ae84c3fbff15448458150df
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot