# Electric Power Resiliency Building 56

Notice ee3c354d33444f8ea8302fb2f23df40c (solicitation SP330027Q0012) from DEPT OF DEFENSE, DLA DISTRIBUTION, posted 2026-11-10, responses due 2026-12-09T18:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | ee3c354d33444f8ea8302fb2f23df40c |
| Solicitation number | SP330027Q0012 |
| Type | Combined Synopsis/Solicitation |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEFENSE LOGISTICS AGENCY |
| Office | DLA DISTRIBUTION |
| Posted | 2026-11-10T19:07:36.000Z |
| Response deadline (UTC) | 2026-12-09T18:00:00.000Z |
| Set-aside | Small Business Set Aside - Total |
| NAICS | 238210 |
| PSC | Z2GZ |
| Place of performance | - |
| Award | - |

## Description

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at theDefense Distribution San Joaquin California.Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaicsystem for building 56. but not limited to:The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed thelisting and qualification tests. All design and installation shall comply with the most recent version of each document.The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor.The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistentwith and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines.There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame sizecircuit breaker spaces are available.

## Sources

- View on SAM.gov: https://sam.gov/opp/ee3c354d33444f8ea8302fb2f23df40c/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"Electric Power Resiliency Building 56, SAM.gov contract opportunity ee3c354d33444f8ea8302fb2f23df40c." samgovapi.io, https://samgovapi.io/opportunity/ee3c354d33444f8ea8302fb2f23df40c, data as of 2026-11-14. Primary record: https://sam.gov/opp/ee3c354d33444f8ea8302fb2f23df40c/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/ee3c354d33444f8ea8302fb2f23df40c
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot