# Mid-Bay James Island Phase 1 Ecosystem Restoration

Notice eeb9fc1951064810b4e5f3e211c80555 (solicitation W912DR26BA001) from DEPT OF DEFENSE, W2SD ENDIST BALTIMORE, posted 2025-11-12, responses due 2026-01-06T16:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | eeb9fc1951064810b4e5f3e211c80555 |
| Solicitation number | W912DR26BA001 |
| Type | Solicitation |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE ARMY |
| Office | W2SD ENDIST BALTIMORE |
| Posted | 2025-11-12T21:15:26.000Z |
| Response deadline (UTC) | 2026-01-06T16:00:00.000Z |
| Set-aside | - |
| NAICS | 237990 |
| PSC | Y1KF |
| Place of performance | - |
| Award | - |

## Description

The USACE Baltimore District intends to solicit for an award a James Island is an ecosystem restoration project (part of the Mid-Chesapeake Bay Island Ecosystem Restoration project, commonly referred to as Mid-Bay) located in the middle Chesapeake Bay in Dorchester County, Maryland, approximately 72 miles south-southeast of the Port of Baltimore and two miles west of Hoopers Island. This contract will include the construction of multiple features at James Island that facilitate the restoration efforts: (1) Construction of dikes; and (2) dredging and stockpiling of sand materials. Dikes (approximately 10,000 linear feet): this feature will include the installation of stone, geotextile and sand materials to create a perimeter dike structure. Stone and geotextile materials will be shipped to the site and installed. Sand materials will be dredged from a local borrow area. Sand Stockpiling (approximately 3,000,000 cubic yards): this feature will include the excavation of substantial sand materials from a local borrow area with placement occurring within the newly constructed dikes (containment area) for future dike construction. The borrow area for sand material excavation (dredging) is located immediately adjacent to the construction area. All work will be performed adjacent to James Island in the Chesapeake Bay, a remote location accessible only by boat. The Contractor shall provide all necessary labor, equipment, materials, and transportation to perform the construction. The magnitude of construction is between $100,000,000 and $250,000,000.00. The construction duration is approximately 1095 calendar days from the Notice to Proceed.

## Sources

- View on SAM.gov: https://sam.gov/opp/eeb9fc1951064810b4e5f3e211c80555/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"Mid-Bay James Island Phase 1 Ecosystem Restoration, SAM.gov contract opportunity eeb9fc1951064810b4e5f3e211c80555." samgovapi.io, https://samgovapi.io/opportunity/eeb9fc1951064810b4e5f3e211c80555, data as of 2026-11-14. Primary record: https://sam.gov/opp/eeb9fc1951064810b4e5f3e211c80555/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/eeb9fc1951064810b4e5f3e211c80555
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
