# W912DY26RA063

Notice fec068aae82049ac9ed2b2fe33085efe (solicitation W912DY26RA063) from DEPT OF DEFENSE, W2V6 USA ENG SPT CTR HUNTSVIL, posted 2026-04-28, responses due 2026-05-07T15:00:00.000Z. Status: open.

| Field | Value |
| --- | --- |
| Notice ID | fec068aae82049ac9ed2b2fe33085efe |
| Solicitation number | W912DY26RA063 |
| Type | Solicitation |
| Agency | DEPT OF DEFENSE |
| Sub-tier | DEPT OF THE ARMY |
| Office | W2V6 USA ENG SPT CTR HUNTSVIL |
| Posted | 2026-04-28T16:35:46.000Z |
| Response deadline (UTC) | 2026-05-07T15:00:00.000Z |
| Set-aside | SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) |
| NAICS | 238910 |
| PSC | P400 |
| Place of performance | - |
| Award | - |

## Description

The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California.Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.

## Sources

- View on SAM.gov: https://sam.gov/opp/fec068aae82049ac9ed2b2fe33085efe/view
- Data as of 2026-11-14. Source: https://sam.gov/data-services/Contract%20Opportunities/datagov

## Cite this

"W912DY26RA063, SAM.gov contract opportunity fec068aae82049ac9ed2b2fe33085efe." samgovapi.io, https://samgovapi.io/opportunity/fec068aae82049ac9ed2b2fe33085efe, data as of 2026-11-14. Primary record: https://sam.gov/opp/fec068aae82049ac9ed2b2fe33085efe/view

## API and MCP

- REST: GET https://samgovapi.io/api/v1/opportunities/fec068aae82049ac9ed2b2fe33085efe
- MCP tool: get_opportunity

Independent. Not affiliated with, endorsed by or sponsored by GSA, SAM.gov or any U.S. government agency. Registering in SAM.gov is free at sam.gov.

Get a free API key: https://samgovapi.io/sign-up?ref=ai-claudebot
